Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the fl-builder domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /chroot/home/a8f11f53/6d2df47d80.nxcli.io/html/wp-includes/functions.php on line 6131 JetPROP Customer Acceptance – JetPROP

Customer Acceptance and Delivery

The cowl is reattached, the airframe cleaned up and prepared for its owner (Fig. 16). In approximately 14 weeks, just about every performance parameter (speed, climb, take-off distance) has improved 20% to 100%.

Standing on the ramp, it is easy to spot a JetPROP DLX (Fig 17). In addition to the four blade propeller, the cowl has been elongated 17 inches and exhaust stacks have been added to help the Pratt & Whitney's PT6A turbine engine breathe.

After customer briefing and checkout, a satisfied conversion customer (Fig. 18) takes off for home.